This wasn't easy as I was not able to be on-site until the construction started, but the communication functioned perfectly.” ![]() All of my wishes were discussed and I was included in all aspects of the decision process to provide the most cost effective solution. The coordination and teamwork between the contractors and the Ellis team worked smoothly and efficiently. The quality of the workmanship is superb, with many flaws being handled before I could even note them. The modular house base included energy star 3.0 features and allowed the house to be completely set on the foundation and 'weather-tight' in 12 hours! No part of this house (except the exterior) has ever been exposed to rain or weather. This was because of the foam insulation providing a water and air-tight barrier from beneath the foundation to the peak professionally installed by their in-house contractor.Īll windows are triple-glazed and an air-exchange system provides humidity and air quality control. The requirement for a well-insulated, energy efficient house is evident by the HERS score of 41, and a Air exchange test of 1.51. ![]() completed my new home in 3 months and fulfilled every one of my design and functional goals.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |